a.) The date on which crates were received and opened at the final destination. b.) A Confirmation that each piece contains the items listed on the packing slips. c.) A report on shipping damage, if any. d.) The date on which the equipment is installed in racks. e.) The date and results of Post-Ship Test........

i.) ........ ber.tst is completed) ii.) .............inter.tst..... f.) The date and results of the boot-up test of the PC and PCFS (if required). g.) The location/configuration information as follows: