Talks
- dec09: alfa surveys workshop:
Cima
status, Rfi (.ppt)
- apr09 vc meeting: telescope
performance, datataking (pdev) (.ppt)
- pointing
- gain,sefd,Tsys,bmwidt 1.5, 5Ghz
- ruze curves
- Tsys Alfa
- Mock spectrometer. status,usage, todo
- feb09: arecibo
radio telescope (.ppt) for teachers workshop.
- mar08
- feb07 vc meeting: Telescope
performance (power point presentation).
- Pointing specs, how we point
- pointing errors
- losing distomats, tiedown cables losing tension
- System performance: gain,tsys,sefd,bw, alfaTsys
- may06 FAST presentation: focusing
and pointing the telescope.
- feb 05 vcmeeting: Telescope
performance (power point presentation).
- pointing: how we do it, model
- distomat failures, tiedown failures, pnt errors when tension
lost.
- Pre 2004 gain curves, gain curvature follows shimming error.
- Recent hi freq measurements: cb5000,cbh 7200. Plot gain,sefd vs
freq.
- Beamwidth vs wavelength shows underillumination of tertiary by
some horns.
- mar 03 ausac: Archiving
spectral line data at arecibo
- mar 03 galfa meeting: rfi
at arecibo (and a little extra).
home_~phil