RFI from TRelectronics distomat

Links:
15,23jun11:rfi from TRelectronics distomat (LLB500-0600) in screen room.
06apr11:rfi from TRelectronics distomat (LLB-60-D) in screen room.

TRelectronics distomat hardware page

Note:
    The LLB-60-d distomat was installed next to distomat 6 (az=330 deg) from early apr11 thru about 20jun11.

History:



15,23jun11: (LLB500-00600) rfi measured in screen room

    TRelectronics sent us the LLB500-00600 distomat (which replaces the older LLB-60-D distomat).
Luis tested this distomat in the screen room on 15jun11 (noshielding) and 23jun11 (laser in shielded cannister but not window cover). The setup was:
The plots show the results of the rfi tests (.ps) (.pdf):

Summary:

processing:x101/110615/dolaser.pro

06apr11: (LLB-60-D) rfi measured in screen room. (top)

    Luis Quintero checked the rfi from the TRelectonics distomat in the screen room on 06apr11. The setup was:
The plots show the rfi from the LLB-60-D distomat  (.ps) (.pdf):

Summary:

processing: x101/110616/dolaser.pro
 

up_rfi_misc_devices
home_~phil