Plots of warmup and cooldown times for
lbw 16K and omt stages:
- 07may09:
lbw warmup (.ps) (.pdf)
- processing:
090507/lbwwarmup.pro
- 20jun08-01jul08:
the warmup, cooldowns (.ps) (.pdf):
- lbw failed three times between 20jun08 and 01jul08
- . The crosshead was
replaced on each warmup.
- On the second two cooldowns, the omt cooldown rate flattened
out
around 180K instead of going all the way down to 80K
- processing:
x101/080702/chklbwtemp.pro
- 03jun05: cooldown times (.ps) (.pdf)
- The lband wide dewar was cooled down on 03jun05.
- The pump had been turned on the day before.
- The cooldown started about 9am 03jun05.
- processing:
x101/050603/lbwcooldown.pro