System temperature
june,2002
Monitoring:
Daily,
yearly
monitoring of the system temperature for all receivers (including alfa).
Alfa
Tsys by month.
Tsys vs Freq for receivers:
Tsys vs frequency was measured for various receivers
using the high correlated cal and the mock spectrometer. The Tsys and
cal value are plotted for each recevier.
processing: x101/090612/tsysmock.pro
TsysA/TsysB ratio !=1, 180 degree az period
Jun02
"polarized" Tsys vs azimuth using cband receiver.
Apr03:
"polarized" Tsys vs az,za using lbw.
May03:
"polarized" Tsys vs az,za using sbh.
Aug05:
"polarized tsys" in using the alfa receiver.
Miscellaneous:
jun08->may09: 327
Tsys vs sky position.
nov04
thru feb05: TsysA/TsysB for alfa observations.
lbw
Tsys for
2002.
Tsys for lbw was computed using the
calibration
scans taken during 2002. The temperature reported is (polA+polB)/2. The
data is plotted by frequency. 2nd order polynomials were also fit to
the
data.
processing:x101/tsys/lbwTsys2002VsZa.pro
Fitting
Tsys(za) using cal on/off data (apr00-jul00)
home_~phil