Interim correlator
02jun,2001
28aug12: polA sbc4 had
larger Tsys than other sbc.
15aug11: sbc1 polB spike in
center of band for bw <=12.5Mhz
07jul11: luis reburns chip
22jun11: sbc3,4 Tsys increase.
halfband filter 3,4 +5 volts supply failed.
07dec10:
spectra with low power levels (.1 to .5) do not show increased
Tsys.
07oct09:
differential receiver chips for hardware blanking
29sep02:
Spectral noise versus integration time using noise source in
downstairs
if/lo.
28sep02:
Spike in central channel of correlator bandpasses (100 min
integration).
25sep02:
The correlator bandpasses using a noise source.
24sep02:
Comparing the computed and measured bandpass shapes of the
digitial
filters/correlator.
02jun01
Problems
adjusting
the
power levels with a large out of band signal
present.
Software:
interim
correlator
idl routines
interim
correlator
programs
SCHEMATICS:
<-