cabling

july,2001

Definitions.
Cable 1. B1 in control room to B2 in dome.
Cable 2. B3 sband power supply building to gregorian dome (B2A)
Cable 3. B1 in control room to laser shack (multi mode)
Cable 5. B1 in control room to B7-12 tiedown 12.
Cable 5a. B7-td12 to B7-TD4
Cable 5b B7-td12 to B7-TD8
Cable 6. Gregorian dome (B2) to ch1 (B8) (single mode)
Cable 7. Gregorian dome (B2) to ch1 (B8) (multi mode)
Cable 8. Gregorian dome (B2) to vertex shelter (B9).
Cable 9. B1 in control room to sband power supply (B3)
Cable 10. B1 control room to birdie generator bowl (6 sm fibers)
Cable 11. B11 timing room to box above 327 rcvr on rotary floor  (alfa)
Platform ethernet.
Patch cable 4. B2 (dome) to turret floor (moveable).
Patch cable 6. B2(dome) to B13 (turret floor fixed).
Patch cable 7 rotary floor (B13) to service platform (B14).
Scramnet fiber routing.
da_ethernet

Definitions. (top)

  • B1 main fiber box in receiver room. It interaces to fiber cable 1,3, and 5.
  • B2 fiber box in gregorian dome tx room. Cable 1 connects B1->B2.
  • B2a fiber box in gregorian dome that connects to sband pwr supply building via cable 2 (B3).
  • B3 fiber box in the sband power supply building.
  • B6 fiber box in laser shack on platform.
  • B7 -12,-4,-8 fiber boxes at tiedowns 12,4,8
  • B8 fiber box in carriage house 1.
  • B9 fiber box in vertex shelter.
  •  B11 fiber box in timing room for alfa (next to pointing rack).
  • B13 fiber box to the left of the turret control box on the fixed floor. B13R are 12 connectors on the right half. B13L are the twelve connectors on the left. In both case B13x.1-6 are the 6 connectors closest to the middle. of the box.
  • B14 fiber box on the service platform
  • C1 connects B1 rcvr room to B2 dome.
  • C2 connects B3 sband power supply building to B2A in dome.
  • C3 connects B1 rcrv room to laser shack B6
  • C5 connects B1 rcvr room with tiedowns B7-12
  • C8 connects B2 to B9. Gregorian main box to vertex shelter.
  • C9 connects B1 rcvr room to B3 in the sband power supply building.
  • C10 connects B1 control room to birdie generator in the bowl
  •  C11 connects B11 timing room to B?? rotary floor box above 327 reciever (for alfa)
  • PC4 connect B2 to rotary floor (moveable). (p4.2 bad)
  • PC6 connects B2 dome  to B13 turret floor fixed.
  • PA,PB connects pointing crate/rfi crate in clock room  to B1. in the clock room these are label 1/a,2/b
  • RP1 - fiber optice repeater in receiver room. Rack 2 hidden in a pull out drawer.
  • RP2 - fiber optic repeater in dome.
  • Cable 1. B1 in control room to B2 in dome. (top)

    36 pairs from B1 in control room to B2 in dome tx room. It is a hybrid cable that also includes 20 single mode fibers.
     
    C1 from to description
    1 PA.1 P8.1 vertex datataking ethernet rx @ pntp1
    2 PA.2 P8.2 vertex datataking ethernet tx @ pntp1
    3 ocu.rx lcu.tx lcu to ocu rs422 link
    4 ocu.tx lcu.rx lcu to ocu rs422 link
    5 PB.11 (PA.3) P8.5 pnt crate irig board to lcu irig board. (PB.11 till PA.3 fixed)16feb03
    6 PA.4 P6.1 turret 485 link. rx @ pnt
    7 PA.5 P6.2 turret 485 link. tx @ pnt
    8 PA.6 P6.3 tertiary ethernet (datataking). rx@pnt
    9 PA.7 P6.4 tertiary ethernet (datataking). tx@pnt
    10 PA.8 P6.5 1 pps for turret and tertiary (splitter in B13)
    11 free free was platform ethernet RP1.6 to RP2.12 this fiber has 5db more loss than fiber 12 and 13 (so we switched to 13)
    12 PA.10 RP2.11rx platform ethernet RP1.5 to RP2.11
    13 PA.9 RP2.11tx platform ethernet RP1.5 to RP2.11 (was c1-11)
    14 PB.7 P6.6 tertiary 1pps (install then remove splitter B13).
    15 nd1 P4.5 noise diode ttl driver pol a/
    16 nd2 free??
    P4.6 noise diode ttl driver polb (note nd1 drives both).
    17 hpib P4.1 hpib extender for datataking gpib
    18 hpib P4.3 hpib extender for datataking gpib.
    19

    gregorian monoplexor driver.
    20

    gregorian monoplexor ack.
    21

    ch1 noise pulse llr1
    22

    ch1 noise poulse llr2
    23

    ch1 monoplexor driver
    24

    ch1 monoplexor ack
    25 Note
    dome
    dome video cameras. From controller at operators desk to video box in tx room dome.
    26 free

     was hpib seti rx @ ctrlroom
    27 free

     was hpib seti tx @ ctrlroom
    28 430con p6.12 430 pwr meter for greg dome
    29 430con
    b7.?
    trigger for ch power meter
    30 free

     (was ch1 overspeed indicator)
    31 430Con
    p6.10
    430 dome power meter
    32 430Con
    p6.11
    430 dome power meter .. note c1.28,31,32.. don't know which is ethernet and which is gate yet...
    33 Note
    top dome
    dome wheel switches
    Note: from dome wheel box ctrl room above irig display
    34 free

    was free
    35 430con
    b7.6
    ch1 power meter ethernet
    36 430con
    b7.7
    ch power meter ethernet

    Cable 2. B3 sband power supply building to B2A (dome). (top)

        This cable connects the sband power supply building with the fiber box B2a in the dome. There are 12 multimode fibers.
    C2
    #'s @B2A
    description
    From
    1


    2


    3


    4


    5
    crowbarTrigFORcvA
    power supply B3
    6
    crowbarTrigFORcvB
    power supply B3
    7


    8


    9
    tti communications for dome.
    B1,9.5 to B2a,2-9. not sure the number at pwrsupply building
    10
    tti communicactions for dome
    B1,9.6 to B2a,2-10. not sure the number at the pwrsupply building


    Cable 3. B1 control room to B6 laser shack on platform corner. (top)

        Cable 3 goes from control room box b1 (2nd box) to laser shack B6. It currently stops at the weather station.
    It comes out at box B1 in the control room columns P,Q There are 12 multi mode fibers.
     
    C3 Description From
    1 pcWeather station to weather station. B1- P1

    Cable 4. B1 control room to laser shack. (top)

        The cable is not yet connectorized. It probably stops at the weather station. There are 5 single mode fibers.

    Cable 5. B1 control room to B7-12 tiedown 12. (top)

        The cable has 12 multi mode fibers. It goes from B12 (cols c,d) in the control room to B7-12 at tiedown 12. From 12 it goes to B7-4, then loops back to B7-12->B7-8. It mainly comes from patch cable 2 (pb2) that goes from B1 to the back of the pntcrate in the clock room.
     
    C5 From To Description
    1 pb2 b7-td12 rs485 rx(master in pntcrate) to tx in td12
    2 pb3 b7-td12 rs485 tx master in pntcrate to rx in td12
    3 pb4 b7-td12 1 second tick for tiedowns 12
    4 pb (black)
    b7-td12
    1 sec tick for tiedown 8
    5 pb (yellow)
    b7-td12
    1 sec tick for tiedown 4
    6


    7

    td8 tx
    8

    td8 rx
    9

    t4tx
    10

    t4rx








    Cable 5a: Td 12 to Td 4 (top)

        This cable connects td 12 to td 4. It also loops back the cables from td4 that need to go to td8. These fibers go back to the fiber box at 12 and then on to td8.
     
    C5A
    From
    To Description
    1 td12 dymec(bottom) td4 rs485 from td12 to td4 (not user which is tx/rx)
    2 td12 dymec(bottom) td4 rsf85 from td12 to td4
    3 td12-5
    Originally from C5.5
    td4tick 1 second tick for td4
    4 td4 dymec bottom td8 
    via 5B.1
    from td4, to to B7-12 then over to td8 via 5B1
    this is how the 485 goes from td4 to td8
    5 td4 dymec bottom td8
    via 5B.2
    see  above
    6 optical splitter B7-12 td8tick I'm not sure this really goes from td12 to 4 to 8...
    My guess is it goes directly from the optical splitter in td12
    to td8 via C5B.
    7


    8


    9 c5.9
    td4
    etherent rx at td4
    10 c5.10
    td4
    ethernet tx at td4
    11


    12



    Cable 5b: Td 12 to Td 8 (top)


     
    C5B
    From
    To Description
    1 c5a:4 td4 dymec(bottom) td8 rs485 from td4 to td8.is looped  back on c5a cable from td4
    2 c5a:5 td4 dymec(bottom) td8 rs485 from td4 to td8.is looped  back on c5a cable from td4
    3 td12-4
    Originally from C5.4
    td8tick 1 second tick for td8
    4


    5


    6


    7


    8


    9 c5.7
    td8
    ethernet rx at td8
    10 c5.8
    td8
    ethernet tx at td8
    11


    12





    Cable 6. Gregorian dome(B2) do carriage house (B8) (top)

        Cable from gregorian dome (b2) to carriage house (b8). This has 5 single mode fibers.

    Cable 7. Gregorian dome (B2) to carriage house (B8). (top)

        This has 12 multi mode fibers.
    c7
    From
    To
    Description
    1



    2



    3



    4



    5



    6
    b1.34
    ch pwrmeter
    ch pwr meter ethernet
    7
    b1.35
    ch pwrmeter
    ch pwr meter ethernet
    8



    9



    10



    11



    12




    Cable 8. Gregorian dome (B2) to vertex shelter (B9). (top)

    Cable 8 connects the box B2 in the dome to B9 in the vertex shelter.
     
    C8 Description From
    1 datataking ethernet (rx @ pntp1) C1.1
    2 datataking ethernet (tx @ pntp1) C1.2
    3 ocu rs 422 link (tx @lcu) C1.3
    4 ocu rs422 link (rx @ lcu) C1.4
    5 irig signal C1.5
    6 platform ethernet (rx @ lcu) RP2.tx7
    7 platform ethernet (tx @ lcu) RP2.rx7
    8 spare
    9

    10

    11

    12

    Cable 9. B1 rcvr room to B3 in sband power supply building. (top)

        This multi mode cable contains 12 fibers.7 are used.
    C9
    Description
    From
    1
    tti transnet communications for power supply tti modules
    Tested 16nov11, tx,rcv meter
     -15.4 dbm
    sband tti optic extender (by sband console)
    2
    tti transnet communications for power supply tti modules
    Tested 16nov11. tx,rcv meter
     -15.6 dbm
    sband tti optic extender (by sband console)
    3


    4


    5
    tti transnet communications  for dome tti modules
    tested 16nov11:
    B1 to pwrSup patch: -16.1dbm
    B1 to B2a dome      : -17.1 dbm
    B1 to ttiOpticExtender sband cab:-17.4dbm
    from sband console. Goes to patch panel in power supply building
    and then up to dome box 2a #2-9
    6
    tti transnet communications for dome tti modules
    tested 16nov11. tx,rcv meter
    B1 to pwrSup patch: -15.6 dbm
    B1 to B2aDome      : -17.1 dbm
    B1 to ttiOpticExtender sband cab:-17.7 dbm
    from sband console. Goes to patch panel in power supply building and then up to dome box 2a #2-10.
    7


    8


    9


    10


    11


    12



    Cable 10. B1 rcvr room to birdie generator bowl. (top)

        There are 6 single mode fibers that go from the control room to the birdie generator in the bowl.

    Cable 11. B11 Alfa Timing room to B? above 327 rcvr.

        timing room to rotary floor box initially installed for alfa.

    C11 multi mode
    1-12 buffer 3
    From
    To
    Description
    1



    2



    3



    4



    5
    B11.5
    B?.5
    alfa temps
    6
    B11.6
    B?.6
    alfa temps
    7
    B11.7
    b?.7
    alfa motor control
    8
    B11.8
    B?.8
    alfa motor control
    9
    B11.9
    B
    alfa on/off switch
    10



    11



    12




    Platform ethernet (top)

        The platform ethernet originates in the rfi crate cpu rfip1. It goes via patch cable PA9,10 to RP1.port6. RP1.port5 goes upstairs to RP2 via C1.11,13.
        The ip net is 192.160.175.000 . The cpu names are:
  • pntp1 in rfi crate. platform0 is the host name for ifconfig on the ethernet port.
  • PA11 rx@rfip1 ->PA.9 ->RP1.tx6
  • PA12 tx@rfip1 -> PA.10->RP1.rx6
  • RP1: The repeater in the receiver room.

  • RP1.rx5 -> B1.C1.13 -> B2.13 -> RP2.tx11 repeater in dome
  • RP1.tx5 -> B1.C1.12 -> B2.12 -> RP2.rx11 repeater in dome
  • RP1.tx4 -> B1.C5.7  -> TD8.
  • RP1.rx4 -> B1.C5.8 -> TD8.
  • RP1.tx3 -> B1.C5.9 -> TD4.
  • RP1.rx3 -> B1.C5.10 -> TD4.
  • RP1.tx2 -> B1.C5.11 -> TD12
  • RP1.rx2 -> B1.C5.12 -> TD12
  • RP2: The repeater in the dome:

    Note: 12oct06: rp2 fails. we used a fiber barrel to jump port 11 input to port 12 input so the dewar monitoring would work. All the other ports won't work till we replace the repeater.
     
    rp2tx Tx  Rx
    12 P4.8 rot flr moveable
    dewar monitoring
    P4.7 rot flr moveable
    dewar monitoring.
    11 B2.13->B1.13->RP1.5 (downstairs) B2.12->B1.12->RP1.5
    10 P6.6 ->B13R.6-> tertiary(notused) P6.9->B13R.9->tertiary(not used)
    9 P6.10->B13R.10->B13L.1->B14.1 P6.11->B13R.11->B13L.2->B14.2 servPlatform
    8 free
    7 C8.6 -> vertex shelter C8.7 -> vertex shelter

    Notes.. PC6  doesn't have enough fibers for the platform ethernet to go to tertiary and the turret fixed
    floor. We'll probably just run it to the tertiary. You can undo the jumper in B13 if you want it at the turret fixed floor.

    Patch cable 4. B2 (dome) to turret floor (moveable). (top)

    Patch cable 4 connects B2 in the dome to the rotary floor (moveable part).
     
    P4 description From
    1 hpib extender tx C1.17
    2 bad
    3 hpib extender rx C1.18
    4 ??
    5 noise diode ttl driver (not used??) C1.15
    6 noise diode ttl driver (not used??) C1.16
    7 platform ethernet (rx @ floor) RP2.tx12
    8 platform ethernet to lcu (tx @ floor) RP2.rx12

    PATCH cable 6. B2(dome) to B13 (turret floor fixed). (top)

    Patch cable 6 connects B2 (dome tx room) to B13 (turret floor next to the turret control box). The cable enters on the backside of the righmost 12 spigots..
     
    PC 6 description B13R
    1 Turret 485. Tx@tur from B2. 6 1
    2 Turret 485. Rx @ tur from B2.7 2
    3 tertiary ethernet (datataing) tx at ter. from B2.8 3
    4 tertiary ethernet (datataking) rx at ter. from B2.9 4
    5 1 pps  for tur and ter. (splitter in box 13) from B2.10 5
    6 platform ethernet (tur/ter) rcv From RP2.tx10 6
    7 bad cable (no connection B13.7 back) 7
    8 bad cable (cable connected B13.8 back but no signal). 8
    9 platform ethernet (tur/ter) tx. From RP2.rx10 9
    10 430 dome power meter ethernet
    10
    11 430 dome power meter ethernet
    11
    12 430 pwr meter gregorian from B2.28 12

    Patch cable 7 rotary floor (B13) to service platform (B14). (top)

    Patch cable 7 connects B13 next to the turret control box to B14 on the service platform. There are
    ?? on the cable number since i made it up (I don't know if it's been assigned an official number).
     
    P7 Description From
    1 platform ethernet (rx @ servPlat) RP2.tx9->P6.10->B13R.10->B13L.1->B14.1
    2 platform ethernet (tx @ servPlat) RP2.rx9->P6.11->B13R.11->B13L.2->B14.2
    3

    Misc. (top)

      These are misc cables that didn't fit in anywhere else
     
    description route
    hilltop rfi monitor gpib gpib fiber extender in pntcrate rack ->to
    PA11,13 -> to controlroom ->to
    M1,2 inputs fiber Junction box below junction box B1 ->
    junction box below water pipe patch box rightmost 2 input (looking from above).This junction box is behind the racks in the control room-->
    Up to rfi shack on hilltop.

    Scramnet fiber routing.

        The scramnet boards are a reflective memory system connected via fibers. It is a ring structure with a pair of cables entering and exiting each station (the order of the pair is
    not important). The connection topology (at least on the fiber labels) are:
    OPR->COR->DA->PNT->OBS->OPR

    Datataking ethernet

        The data ethernet for the vxworks datatking is a 10 Mbit ethernet coax (limited by the single board computer ethernet transceivers). The cabling order is:
     

    <- page up